Project Overview
Paving, bridge appurtenances, bulkhead work, sidewalks, signage, and site restoration.
Scope of Work
- 8-inch reinforced concrete pavement
- Decorative / stamped concrete paving
- 8-inch lime-stabilized compacted subgrade
- Common road and right-of-way grading
- Reinforced concrete curb
- Traffic signs, street signs, and striping
- Sheet pile installation
- Steel H-pile installation
- Concrete cap, pony wall, and planter seat
- Stone veneer, pedestrian rail, sidewalk, and final cleanup
“Self-performed civil from clearing through final paving — one schedule, one foreman, one number.”
Project Timeline
- ● Active · Q2 2026Mobilization & Site Preparation
Mobilize crews and equipment, establish access, prepare the work area, and begin roadway and bridge-related coordination.
- ● Active · Q2–Q3 2026Earthwork & Subgrade Preparation
Complete common grading, right-of-way preparation, lime-stabilized subgrade, and roadway base preparation.
- Upcoming · Q3–Q4 2026Bulkhead & Bridge Appurtenances
Bulkhead & Bridge Appurtenances Description: Install sheet piles, steel H-piles, concrete cap, pony wall, planter seat, stone veneer, and related bridge appurtenance improvements.
- Upcoming · Q4 2026–Q1 2027Paving, Pedestrian Improvements & Closeout
Complete reinforced concrete paving, decorative concrete, curbs, sidewalks, pedestrian rail, signs, striping, final cleanup, and project closeout.