MOVING DIRT · BUILDING ROADS · DEVELOPING COMMUNITIESBUILD YOUR CAREER WITH A FAMILY-OWNED HOUSTON CONTRACTOR832-409-5740WE ARE HIRING: Fuel Lube Truck Drivers, PM Mechanics, Foremen, Superintendents, CDL Water Truck Drivers, Estimators, and Operators.MOVING DIRT · BUILDING ROADS · DEVELOPING COMMUNITIESBUILD YOUR CAREER WITH A FAMILY-OWNED HOUSTON CONTRACTOR832-409-5740WE ARE HIRING: Fuel Lube Truck Drivers, PM Mechanics, Foremen, Superintendents, CDL Water Truck Drivers, Estimators, and Operators.
NorthTex Construction

Active & Recent

Texas project map
Active · 20
Complete · 4
Upcoming · 0
24 of 24 projects
active📍 Liberty County, Texas
WATER · SANITARY · DRAINAGE · PAVING

Sterling Traditions Section 2

Water, sanitary sewer, drainage, and concrete paving improvements with trench safety, dewatering, and site restoration.

Scope
Water, sanitary sewer, drainage, and concrete paving improvements with trench safety, dewatering, and site restoration.
Budget
$3.5M
Timeline
3 Months
Read full case study →
active📍 Galveston County, Texas
PAVING · BRIDGE · UTILITIES

Legacy Drive Phase 2.

Paving, bridge appurtenances, utility adjustments, pavement repair, and site cleanup.

Scope
Paving, bridge appurtenances, utility adjustments, pavement repair, and site cleanup.
Budget
$3.3M
Timeline
9 Months
Read full case study →
active📍 League City, Texas
PAVING · BRIDGE · BULKHEAD

Legacy Bridge

Paving, bridge appurtenances, bulkhead work, sidewalks, signage, and site restoration.

Scope
Paving, bridge appurtenances, bulkhead work, sidewalks, signage, and site restoration.
Budget
Timeline
8 months
Read full case study →
active📍 Waller County, Texas
MASS GRADING · DETENTION · DRAINAGE

Cottonwood Trails Mass Grading & Detention

Mass grading, detention, drainage, retaining wall, and erosion control improvements.

Scope
Mass grading, detention, drainage, retaining wall, and erosion control improvements.
Budget
$1.7M
Timeline
3 months
Read full case study →
active📍 Missouri City, TX

Palmer Plantation Sewer Treatment

Install storm sewer, reinforced concrete box culverts, storm manholes, junction boxes, inlets, groundwater control, and drainage connections.

Scope
Budget
Timeline
Read full case study →
active📍 Brazoria County, Texas
UTILITY REPAIR · DEWATERING · MANHOLE

Meridiana MH Repair

Sanitary sewer line and manhole repair with dewatering, trench safety, temporary access, and site restoration.

Scope
Sanitary sewer line and manhole repair with dewatering, trench safety, temporary access, and site restoration.
Budget
$360k
Timeline
1 months
Read full case study →
active📍 Fort Bend County, Texas
ROADWAY · BRIDGE · DRAINAGE

Chimney Rock Road

Roadway construction project for Chimney Rock Road, Segment Two, from American Canal to McHard Road. The work includes the materials, labor, equipment, tools, services, and supervision needed to complete the road construction project for Fort Bend County

Scope
Roadway, bridge, drainage, pump station, and utility improvements
Budget
$16.4M
Timeline
17 months
Read full case study →
active📍 Dayton, TX
MASS GRADING · DETENTION · EARTHWORK

Trinity Landing

Mass Grading and Detention Facilities to Serve the Trinity Landing Development

Scope
heavy civil site development / mass grading and drainage
Budget
$4,7M
Timeline
7 months
Read full case study →
active📍 Willis, TX, 77378

Moran Ranch Sec 7&9

Install storm sewer, reinforced concrete box culverts, storm manholes, junction boxes, inlets, groundwater control, and drainage connections.

Scope
Budget
Timeline
Read full case study →
active📍 Harris County, Texas
DRAINAGE · DETENTION · MASS GRADING

Midline Phase 2

Mass grading, detention, and drainage improvements with excavation, storm sewer, dewatering, and site restoration.

Scope
Mass grading, detention, and drainage improvements with excavation, storm sewer, dewatering, and site restoration.
Budget
$7.6M
Timeline
8 Months
Read full case study →
active📍 Harris County, Texas
UTILITIES · STORMWATER · DRAINAGE

Cedar Pointe Section 9

Water, wastewater, and stormwater utility improvements for Cedar Pointe Section Nine.

Scope
Water, wastewater, and stormwater utility improvements for Cedar Pointe Section Nine.
Budget
$1.6M
Timeline
2 months
Read full case study →
active📍 Tomball, TX

Somerset D&MG

Install storm sewer, reinforced concrete box culverts, storm manholes, junction boxes, inlets, groundwater control, and drainage connections.

Scope
Budget
Timeline
Read full case study →
active📍 Manvel, TX

Meridiana Sec 35B

Install storm sewer, reinforced concrete box culverts, storm manholes, junction boxes, inlets, groundwater control, and drainage connections.

Scope
Budget
Timeline
Read full case study →
active📍 East T.C. Jester area — Harris County, Texas
STORMWATER · DETENTION · EARTHWORK

East T.C. Jester Stormwater Detention Basin

This is a stormwater detention basin / flood control project for the Harris County Flood Control District.

Scope
Heavy civil construction services for the East T.C. Jester Stormwater Detention Basin project
Budget
$1.9M
Timeline
11 months
Read full case study →
active📍 Conroe / Montgomery County, Texas
12–20 personnel

Grace Landing Sec 2

Water, wastewater, drainage, and paving improvements with trench safety, dewatering, and site restoration.

Scope
Water, wastewater, drainage, and paving improvements with trench safety, dewatering, and site restoration.
Budget
TBD
Timeline
Read full case study →
active📍 Barrett Crossing Subdivision, Texas
DETENTION · UTILITIES · PAVING

Barret Crossing Sec.2

Detention, utilities, storm drainage, paving, and site restoration for a residential subdivision.

Scope
Detention, utilities, storm drainage, paving, and site restoration for a residential subdivision.
Budget
$5.6M
Timeline
7 months
Read full case study →
active📍 Liberty County, Texas
UTILITIES · DRAINAGE · PAVING

Sterling Traditions Sections 1 & 3 Utilities, Drainage & Paving

Water, sanitary sewer, drainage, and concrete paving improvements for Sterling Traditions Sections 1 & 3.

Scope
Water, sanitary sewer, drainage, and concrete paving improvements for Sterling Traditions Sections 1 & 3.
Budget
$3.9M
Timeline
4 months
Read full case study →
active📍 Crosby, TX

Cedar Point Sec. 7

Install storm sewer, reinforced concrete box culverts, storm manholes, junction boxes, inlets, groundwater control, and drainage connections.

Scope
Budget
Timeline
Read full case study →
active📍 Dickinson, TX

Hughes Landing

Install storm sewer, reinforced concrete box culverts, storm manholes, junction boxes, inlets, groundwater control, and drainage connections.

Scope
Budget
Timeline
Read full case study →
active📍 Brazoria County, Texas
UTILITIES · STORMWATER · PAVING

Meridiana Section 8A

Water, wastewater, stormwater, paving, and grading improvements for Meridiana Section Eight-A.

Scope
Water, wastewater, stormwater, paving, and grading improvements for Meridiana Section Eight-A.
Budget
$2.0M
Timeline
4 months
Read full case study →
complete📍 Brazoria County, Texas
WATER · SANITARY · DRAINAGE

Creek Haven Sec 4

Water, sanitary sewer, and storm drainage improvements with trench safety, dewatering, and site restoration.

Scope
Water, sanitary sewer, and storm drainage improvements with trench safety, dewatering, and site restoration.
Budget
$2.8M
Timeline
3 Months
Read full case study →
complete📍 Chambers Creek
MASS GRADING · EARTHWORK · SITEWORK

Chambers Creek Phase 3B Mass Grading

Mass grading and earthwork with excavation, site grading, SWPPP controls, and site cleanup.

Scope
Mass grading and earthwork with excavation, site grading, SWPPP controls, and site cleanup.
Budget
Timeline
3 Months
Read full case study →
complete📍 Montgomery County, Texas
DETENTION · UTILITIES · PAVING

Chapel Run Phase III

Detention, utilities, drainage, and paving improvements for a residential land development.

Scope
Detention, utilities, drainage, and paving improvements for a residential land development.
Budget
$5.3M
Timeline
TBD
Read full case study →
complete📍 McCrary Road from FM 359 to Old McCrary, Fort Bend County, Texas
ROADWAY · DRAINAGE · WIDENING

McCrary Road

Northtex Construction is performing a roadway reconstruction and widening

Scope
Roadway widening with concrete paving, drainage, sidewalks, traffic signals, and site restoration.
Budget
$12.2M
Timeline
18 months
Read full case study →

Have plans?
We have crews.

Send us your scope, drawings, and target schedule. Our team will review the project and follow up with the next steps for pricing, scheduling, and coordination.