Active & Recent
Sterling Traditions Section 2
Water, sanitary sewer, drainage, and concrete paving improvements with trench safety, dewatering, and site restoration.
Legacy Drive Phase 2.
Paving, bridge appurtenances, utility adjustments, pavement repair, and site cleanup.
Legacy Bridge
Paving, bridge appurtenances, bulkhead work, sidewalks, signage, and site restoration.
Cottonwood Trails Mass Grading & Detention
Mass grading, detention, drainage, retaining wall, and erosion control improvements.
Palmer Plantation Sewer Treatment
Install storm sewer, reinforced concrete box culverts, storm manholes, junction boxes, inlets, groundwater control, and drainage connections.
Meridiana MH Repair
Sanitary sewer line and manhole repair with dewatering, trench safety, temporary access, and site restoration.
Chimney Rock Road
Roadway construction project for Chimney Rock Road, Segment Two, from American Canal to McHard Road. The work includes the materials, labor, equipment, tools, services, and supervision needed to complete the road construction project for Fort Bend County
Trinity Landing
Mass Grading and Detention Facilities to Serve the Trinity Landing Development
Moran Ranch Sec 7&9
Install storm sewer, reinforced concrete box culverts, storm manholes, junction boxes, inlets, groundwater control, and drainage connections.
Midline Phase 2
Mass grading, detention, and drainage improvements with excavation, storm sewer, dewatering, and site restoration.
Cedar Pointe Section 9
Water, wastewater, and stormwater utility improvements for Cedar Pointe Section Nine.
Somerset D&MG
Install storm sewer, reinforced concrete box culverts, storm manholes, junction boxes, inlets, groundwater control, and drainage connections.
Meridiana Sec 35B
Install storm sewer, reinforced concrete box culverts, storm manholes, junction boxes, inlets, groundwater control, and drainage connections.
East T.C. Jester Stormwater Detention Basin
This is a stormwater detention basin / flood control project for the Harris County Flood Control District.
Grace Landing Sec 2
Water, wastewater, drainage, and paving improvements with trench safety, dewatering, and site restoration.
Barret Crossing Sec.2
Detention, utilities, storm drainage, paving, and site restoration for a residential subdivision.
Sterling Traditions Sections 1 & 3 Utilities, Drainage & Paving
Water, sanitary sewer, drainage, and concrete paving improvements for Sterling Traditions Sections 1 & 3.
Cedar Point Sec. 7
Install storm sewer, reinforced concrete box culverts, storm manholes, junction boxes, inlets, groundwater control, and drainage connections.
Hughes Landing
Install storm sewer, reinforced concrete box culverts, storm manholes, junction boxes, inlets, groundwater control, and drainage connections.
Meridiana Section 8A
Water, wastewater, stormwater, paving, and grading improvements for Meridiana Section Eight-A.
Creek Haven Sec 4
Water, sanitary sewer, and storm drainage improvements with trench safety, dewatering, and site restoration.
Chambers Creek Phase 3B Mass Grading
Mass grading and earthwork with excavation, site grading, SWPPP controls, and site cleanup.
Chapel Run Phase III
Detention, utilities, drainage, and paving improvements for a residential land development.
McCrary Road
Northtex Construction is performing a roadway reconstruction and widening
Have plans?
We have crews.
Send us your scope, drawings, and target schedule. Our team will review the project and follow up with the next steps for pricing, scheduling, and coordination.
