Project Overview
Water, sanitary sewer, and storm drainage improvements for Creekhaven Section 4, including utility installation, manholes, storm sewer, inlets, trench safety, dewatering, testing, and site restoration.
Scope of Work
- 8-inch sanitary sewer installation
- Sanitary sewer service leads
- Sanitary manholes and drop connections
- CCTV inspection and testing
- 8-inch waterline installation
- Water services, valves, and flush assemblies
- Storm sewer installation
- Storm inlets and manholes
- Trench safety and dewatering
- SWPPP, erosion control, seeding, and site restoration
“Self-performed civil from clearing through final paving — one schedule, one foreman, one number.”
Project Timeline
- ✓ Complete · Q1 2026Sanitary Sewer & Waterline Installation
Install sanitary sewer, service leads, manholes, 8-inch waterline, valves, water services, and flush assemblies.
- ✓ Complete · Q1–Q2 2026torm Sewer & Drainage Improvements
Install RCP storm sewer, inlets, manholes, trench safety, dewatering, and drainage structures.
- ✓ Complete · Q2 2026Testing, Restoration & Closeout
Complete CCTV inspection, utility testing, erosion control cleanup, seeding, site restoration, as-builts, and final closeout.