MOVING DIRT · BUILDING ROADS · DEVELOPING COMMUNITIESBUILD YOUR CAREER WITH A FAMILY-OWNED HOUSTON CONTRACTOR832-409-5740WE ARE HIRING: Fuel Lube Truck Drivers, PM Mechanics, Foremen, Superintendents, CDL Water Truck Drivers, Estimators, and Operators.MOVING DIRT · BUILDING ROADS · DEVELOPING COMMUNITIESBUILD YOUR CAREER WITH A FAMILY-OWNED HOUSTON CONTRACTOR832-409-5740WE ARE HIRING: Fuel Lube Truck Drivers, PM Mechanics, Foremen, Superintendents, CDL Water Truck Drivers, Estimators, and Operators.
NorthTex Construction
Home/Projects/Cedar Pointe Section 9
● Active Jobsite

Cedar Pointe Section 9

Water, wastewater, and stormwater utility improvements for Cedar Pointe Section Nine.

Budget
$1.6M
Timeline
2 months
Team
10–18 personnel
Scope
Water, wastewater, and stormwater utility improvements for Cedar Pointe Section Nine.
Status
Active
Client
Crosby Municipal Utility District

Project Overview

Water, wastewater, and stormwater utility improvements for Cedar Pointe Section Nine.

Lots
124 lots
Acreage
Approximately 25.9 acres
Concrete
Reinforced concrete slope paving, storm structures, inlets, and manholes
Dewatering
Trench dewatering and wellpoint system where authorized
Restoration
SWPPP controls, reinforced filter fabric, turf establishment, seeding, and site cleanup
Water Line
8-inch and 12-inch C900 PVC waterline
Wastewater
8-inch and 10-inch SDR-26 PVC sanitary sewer
Storm Sewer
RCP storm sewer from 24-inch to 60-inch
Drainage
Swales, storm manholes, Type C inlets, Type C1 inlets, Type E inlets, and slope paving

Scope of Work

  • Water distribution system installation
  • Wastewater collection system installation
  • Storm sewer installation
  • Storm manholes, inlets, and drainage structures
  • Proposed swale construction
  • Reinforced concrete slope paving
  • Trench safety and dewatering
  • Stormwater pollution prevention controls
  • Construction staking and post-construction survey
  • Turf establishment, seeding, and final cleanup
“Self-performed civil from clearing through final paving — one schedule, one foreman, one number.”

Project Timeline

  1. ● Active · Q3 2026
    Mobilization & Site Preparation

    Mobilize crews and equipment, complete construction staking, prepare access, install SWPPP controls, and begin site setup.

  2. Upcoming · Q3 2026
    Water & Wastewater Installation

    Install waterlines, valves, fire hydrants, sanitary sewer pipe, manholes, service leads, trench safety, and dewatering.

  3. Upcoming · Q3 2026
    Stormwater & Drainage Improvements

    Install storm sewer, swales, manholes, inlets, slope paving, trench safety, and drainage connections.

  4. Upcoming · Q3 2026
    Restoration & Closeout

    Complete SWPPP cleanup, turf establishment, seeding, post-construction survey, final cleanup, and project closeout.

/05Outcomes

What we delivered.

124
Lots
Cedar Pointe Section Nine
Utilities
Infrastructure
Water and wastewater systems
Drainage
Drainage System
Storm sewer, swales, and inlets

Building something
like this?

If you have a similar scope to bid, send us your drawings and target schedule. We respond inside 48 hours.